product description page

Molecules to Medicine With Mtor : Translating Critical Pathways into Novel Therapeutic Strategies

Molecules to Medicine With Mtor : Translating Critical Pathways into Novel Therapeutic Strategies - image 1 of 1

about this item

Molecules to Medicine with mTOR: Translating Critical Pathways into Novel Therapeutic Strategies is a one-stop reference that thoroughly covers the mechanistic target of rapamycin (mTOR). mTOR, also known as the mammalian target of rapamycin, is a 289-kDa serine/threonine protein kinase that is ubiquitous throughout the body and has a critical role in gene transcription and protein formation, stem cell development, cell survival and senescence, aging, immunity, tissue regeneration and repair, metabolism, tumorigenesis, oxidative stress, and pathways of programmed cell death that include apoptosis and autophagy. Incorporating a translational medicine approach, this important reference highlights the basic cellular biology of mTOR pathways, presents the role of mTOR during normal physiologic function and disease, and illustrates how the mechanisms of mTOR can be targeted for current and future therapeutic treatment strategies.  Coverage of mTOR signaling includes the entire life cycle of cells that impacts multiple systems of the body including those of nervous, cardiovascular, immune, musculoskeletal, endocrine, reproductive, renal, and respiratory origin.
  • Covers the role of mTOR by internationally recognized expert contributors in the field.
  • Provides a clear picture of the complexity of mTOR signaling as well as of the different approaches that could target this pathway at various levels.
  • Includes analysis of the role of mTOR and in both health and disease.
  • Serves as an important resource for a broad audience of healthcare providers, scientists, drug developers, and students in both clinical and research settings.
Number of Pages: 472
Genre: Medical
Sub-Genre: Anatomy, Physiology
Format: Hardcover
Publisher: Elsevier Science Ltd
Author: Kenneth Maiese
Language: English
Street Date: February 26, 2016
TCIN: 50955587
UPC: 9780128027332
Item Number (DPCI): 248-13-0863

guest reviews

Prices, promotions, styles and availability may vary by store & online. See our price match guarantee. See how a store is chosen for you.